National Highway 76 (Chittorgarh-Udaipur Section)

The four-lane to six-lane widening project for the Chittorgarh-Udaipur section of National Highway 76 has been approved. The total length of the project is 93.5 km, with a total investment of ₹1100 crores. This expansion will improve traffic flow, reduce congestion, and enhance the overall driving experience for commuters between Chittorgarh and Udaipur.

National Highway 79 (Gulabpura to Chittorgarh Bypass Section)

The project for widening the National Highway 79 from four lanes to six lanes, connecting Gulabpura to the Chittorgarh Bypass, has been completed. The total project cost is ₹1240 crores, improving transportation efficiency and providing smoother connectivity for heavy traffic on this key route.

Chittorgarh-Badisadri Road

The strengthening and widening of the road from Hoda Bhadesar to Avari Mata Nikumbh Crossing and from Badisadri to Bansi Road in the Chittorgarh-Badisadri assembly area has been completed. The total road length is 59 km, and the project was completed with an investment of ₹77.25 crores.

Nimbahera-Keli to Kanera Road

The strengthening and widening of the Nimbahera-Keli to Kanera road has been completed in the Nimbahera assembly area. The total length of the road is 20 km, and the total approved cost is ₹27.98 crores.

Bengu to Badodia Road (SH-9A)

The strengthening and widening of the road from Bengoo to Badodia (SH-9A), covering a total length of 36.30 km, has been completed with an investment of ₹52.59 crores.

Bengu to Rawatbhata Road

A new strengthening and widening project for the Bengu to Rawatbhata road, totaling 29 km, was approved with an investment of ₹29 crores.

Bengu to Kota Road (SH-33)

The strengthening of the road from Bengu to Kota (SH-33) from 0 km to 11 km was approved under the Central Road Fund (CRF) with a budget of ₹19.13 crores. This project improves access between Rawatbhata and Kota, reducing travel time.

Badisadri to Mangalwad Road (SH-15)

The strengthening and widening of the Mangalwad to Badisadri road, with an additional CC pavement for village portions like Mangalwad, Biloda, and Dungla, has been completed. The total length is 46.60 km, with a total investment of ₹54.80 crores.

Badisadri to Pratapgarh Road

The strengthening and widening of the Pratapgarh-Thada-Neemach road from 15 km to 25.4 km (MDR-215) covering areas like Thada, Baradiya, Kajli, Bhuvasia, Kamliya, Dhamliya, Panmodi, and Rathanja has been sanctioned. The investment for this project is ₹15 crores, and the work is currently in progress.

Mavli to Powerhouse-Gudli-Khemli-Ghasa-Palana-Mavli Road

The strengthening and widening of the Mavli-Gudli road spanning 38 km has been sanctioned with an investment of ₹54.74 crores. This development will benefit 17 Gram Panchayats in areas like Bhainsadakla, Bhainsadakhurd, Nauva, Chandesra, Vijanwas, Gudli, Tulsi Das Ki Sarai, Khemli, Sangwa, Rakhyawal, Ghassa, Dholimongri, Mangthala, Sindhu, Palanaakhurd, Palanakalan, Bansaliya, and others.

Mavli to Kherli (NH-76) Road

The strengthening and widening of the Mavli to Kherli (NH-76) road, which covers 30.50 km with the creation of a four-lane SH-98 and CC pavement in village portions, is progressing. The investment in this project is ₹60.72 crores.

Chittorgarh Assembly Area

A road construction project covering 175 km with an investment of ₹18.32 crores has been completed under the Pradhan Mantri Gram Sadak Yojana.

Nimbahera Assembly Area

A total of 168 km of roads have been constructed under the scheme with an investment of ₹52.59 crores.

Bengu Assembly Area

A total of 199 km of roads have been constructed under the scheme with an investment of ₹74.98 crores.

Badisadri Assembly Area

Roads covering 122.6 km with an investment of ₹38.90 crores have been constructed under this initiative.

Kapasan Assembly Area

The Kapasan Assembly Area has benefited from the construction of 191 km of roads under the PMGSY, with an investment of ₹96.32 crores.

Pratapgarh Assembly Area

122 km of roads have been constructed under the scheme in Pratapgarh, with a total investment of ₹43.14 crores.

Mavli Assembly Area

55 km of roads have been constructed in Mavli with an investment of ₹22.03 crores.

Vallabhnagar Assembly Area

74.28 km of roads have been constructed in Vallabhnagar, with a total investment of ₹20.76 crores.